2 EV Charging Stations in Roanoke, IN
Locations, networks, and charger types — updated weekly from U.S. DOE data
2 EV charging stations in Roanoke — 2 Tesla Destination . Last updated May 9, 2026.
Where Are the 2 Charging Stations in Roanoke?
Which EV Charging Networks Operate in Roanoke, IN?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Roanoke, Indiana has 2 publicly accessible EV charging stations with 2 charging ports. Tesla Destination operates 100% of stations in the area — part of Indiana's 768 stations statewide.
All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.
Drivers needing more charging options can find 75 stations in nearby Fort Wayne, approximately 24 miles away. See how IN compares with Michigan for broader regional context.
What Is the EV Charging Outlook for Roanoke?
Level 2 Focused Infrastructure
Roanoke's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Tesla Destination Stronghold
Tesla Destination leads the market in Roanoke with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Roanoke?
Fort Wayne, Indiana
Kokomo, Indiana
Goshen, Indiana
Elkhart, Indiana
Plymouth, Indiana
Warsaw, Indiana
Wabash, Indiana
Coldwater, Ohio
Angola, Indiana
Auburn, Indiana
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Roanoke
1 hotel with on-site EV charging · 1 Tesla Destination · 1 Level 2 ports
The Inn at Joseph Decuis
⚡ Tesla492 N Main St
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."