1 EV Charging Stations in Mud Lake, ID

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

As of March 2026, Mud Lake, Idaho has 1 publicly accessible EV charging station with 2 charging ports. Non-Networked operates 100% of stations in the area — part of Idaho's 270 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 25 stations in nearby Idaho Falls, approximately 68 miles away. See how ID compares with Washington for broader regional context.

1 EV charging stations in Mud Lake — 1 Non-Networked . Last updated March 2026.

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Mud Lake, ID?

All 1 stations active as of 2026-03-22 See full Idaho outage report →

Where Are the 1 Charging Stations in Mud Lake?

SMC Parking Lot

Snake Ave
Non-Networked Fed Gov
NEMA 14-50

What Is the EV Charging Outlook for Mud Lake?

Level 2 Focused Infrastructure

Mud Lake's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Mud Lake with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Mud Lake?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)