3 EV Charging Stations in Leesburg, GA

Locations, networks, and charger types — updated weekly from U.S. DOE data

3
Charging Stations

As of March 2026, Leesburg, Georgia has 3 publicly accessible EV charging stations with 4 charging ports. ChargePoint Network operates 100% of stations in the area — part of Georgia's 2,444 stations statewide.

50% of ports (2) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 50% (2) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

Drivers needing more charging options can find 18 stations in nearby Tifton, approximately 73 miles away. See how GA compares with Florida for broader regional context.

3 EV charging stations in Leesburg — 3 ChargePoint Network , 2 public DC fast chargers. Last updated March 2026.

Infrastructure Grade

50% DC Fast

Based on DC Fast Charger ratio

2 of 4 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 3
Ports per Station 1.3

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Leesburg, GA?

All 3 stations active as of 2026-03-22 See full Georgia outage report →

Where Are the 3 Charging Stations in Leesburg?

GEORGIA POWER LEESBURG L2

445 Oakland Pkwy
24 hours daily
J1772 (Level 2)

GEORGIA POWER LEESBURG DC2

445 Oakland Pkwy
24 hours daily
CHAdeMO (DC Fast) CCS/SAE Combo

GEORGIA POWER LEESBURG DC1

445 Oakland Pkwy
24 hours daily
CHAdeMO (DC Fast) CCS/SAE Combo

What Is the EV Charging Outlook for Leesburg?

High-Speed Charging Hub

Leesburg has exceptional DC fast charging coverage with 50% of ports being high-speed chargers, well above the national average.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Leesburg with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Leesburg?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)