Verified · Jun 21, 2026

No working DC fast chargers in St Augustine Beach yet

Just 10 Level 2 ports across Tesla Destination, CHARGEUP.

Live reliability
0 working now none down

Stations · 2

98% working at Florida · verified Jun 7, 2026

Courtyard by Marriott St. Augustine Beach - Tesla Destination

605 A1A Beach Blvd
Working
Tesla Destination Level 2 8 ports J1772 + Tesla
98% working

St. Augustine Beach City Hall

2200 S.R. A1A South
Working
CHARGEUP Level 2 2 ports J1772
98% working
Home charging in Florida costs 14.86¢/kWh — a full charge (60 kWh) costs about $8.92. Compare electricity prices →
All 2 stations active as of 2026-06-21 See full Florida outage report →

Which EV Charging Networks Operate in St Augustine Beach, FL?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 10 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 5.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, St Augustine Beach, Florida has 2 publicly accessible EV charging stations with 10 charging ports. Tesla Destination operates 50% of stations in the area, followed by CHARGEUP at 50% — part of Florida's 4,706 stations statewide.

All 10 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.

Drivers needing more charging options can find 184 stations in nearby Jacksonville, approximately 58 miles away. See how FL compares with Georgia for broader regional context.

What Is the EV Charging Outlook for St Augustine Beach?

Level 2 Focused Infrastructure

St Augustine Beach's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

High-Capacity Stations

Charging stations in St Augustine Beach average 5.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near St Augustine Beach?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

🏨 Charge While You Stay — Hotels with EV Charging in St Augustine Beach

1 hotel with on-site EV charging · 1 Tesla Destination · 8 Level 2 ports

Courtyard by Marriott St. Augustine Beach

⚡ Tesla

605 A1A Beach Blvd

🔌 8 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.