1 EV Charging Stations in St Augstine, FL

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in St Augstine — 1 Blink Network . Last updated May 9, 2026.

Where Are the 1 Charging Stations in St Augstine?

Aspire at Silverleaf

105 Aspire Dr
24 hours daily
J1772 (Level 2)
All 1 stations active as of 2026-05-09 See full Florida outage report →

Which EV Charging Networks Operate in St Augstine, FL?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 6 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 6.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, St Augstine, Florida has 1 publicly accessible EV charging station with 6 charging ports. Blink Network operates 100% of stations in the area — part of Florida's 4,659 stations statewide.

All 6 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our Blink network. View national charging statistics for broader context.

Drivers needing more charging options can find 184 stations in nearby Jacksonville, approximately 34 miles away. See how FL compares with Georgia for broader regional context.

What Is the EV Charging Outlook for St Augstine?

Level 2 Focused Infrastructure

St Augstine's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Blink Network Stronghold

Blink Network leads the market in St Augstine with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in St Augstine average 6.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near St Augstine?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)