1 EV Charging Stations in North Bay Village, FL

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in North Bay Village — 1 Blink Network . Last updated May 9, 2026.

Where Are the 1 Charging Stations in North Bay Village?

Space 01 Condominiums

7934 West Dr
24 hours daily
Free
J1772 (Level 2)
All 1 stations active as of 2026-05-09 See full Florida outage report →

Which EV Charging Networks Operate in North Bay Village, FL?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, North Bay Village, Florida has 1 publicly accessible EV charging station with 2 charging ports. Blink Network operates 100% of stations in the area — part of Florida's 4,659 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our Blink network. View national charging statistics for broader context.

Drivers needing more charging options can find 386 stations in nearby Miami, approximately 12 miles away. See how FL compares with Georgia for broader regional context.

What Is the EV Charging Outlook for North Bay Village?

Level 2 Focused Infrastructure

North Bay Village's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Blink Network Stronghold

Blink Network leads the market in North Bay Village with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near North Bay Village?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)