Verified · Jun 21, 2026

No working DC fast chargers in Juno Beach yet

Just 50 Level 2 ports across SWTCH, Non-Networked.

Live reliability
0 working now none down

Stations · 3

98% working at Florida · verified Jun 7, 2026

Florida Power & Light - Juno Beach Headquarters

700 Universe Blvd
Working
Non-Networked Level 2 44 ports J1772
98% working

SWTCH Energy Inc.

700 Universe Blvd
Working
SWTCH Level 2 3 ports J1772
100% working

SWTCH Energy

700 Universe Blvd
Working
SWTCH Level 2 3 ports J1772
100% working
Home charging in Florida costs 14.86¢/kWh — a full charge (60 kWh) costs about $8.92. Compare electricity prices →
All 3 stations active as of 2026-06-21 See full Florida outage report →

Which EV Charging Networks Operate in Juno Beach, FL?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 50 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 3
Ports per Station 16.7

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Juno Beach, Florida has 3 publicly accessible EV charging stations with 50 charging ports. SWTCH operates 66.7% of stations in the area, followed by Non-Networked at 33.3% — part of Florida's 4,706 stations statewide.

All 50 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 106 stations in nearby West Palm Beach, approximately 16 miles away. See how FL compares with Georgia for broader regional context.

What Is the EV Charging Outlook for Juno Beach?

Level 2 Focused Infrastructure

Juno Beach's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

SWTCH Stronghold

SWTCH leads the market in Juno Beach with 67% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Juno Beach average 16.7 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Juno Beach?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.