60 EV Charging Stations in Loveland, CO

Locations, networks, and charger types — updated weekly from U.S. DOE data

60
Charging Stations

As of March 2026, Loveland, Colorado has 60 publicly accessible EV charging stations with 184 charging ports. ChargePoint Network operates 45% of stations in the area, followed by Blink Network at 16.7% — part of Colorado's 2,845 stations statewide.

10% of ports (19) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 89% (163) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS), CHAdeMO. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Colorado's EV infrastructure compares with Arizona.

Infrastructure Grade

10% DC Fast

Based on DC Fast Charger ratio

19 of 184 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 60
Ports per Station 3.1

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Loveland, CO?

Where Are the 60 Charging Stations in Loveland?

Embassy Suites by Hilton Loveland Hotel, Spa & Conference Center - Tesla Supercharger

24 hours daily. Please check Tesla's online station map to see if an adapter is required at this location.
Tesla
10 DC Fast
Tesla

Centerra Condos Loveland - Enertech

24 hours daily
$0.30 per kWh
AUTEL Multi Unit Dwelling
8 Level 2
J1772 (Level 2)

Lakeshore Condos Loveland - Enertech

24 hours daily
$0.30 per kWh
AUTEL Multi Unit Dwelling
8 Level 2
J1772 (Level 2)

High Plains Village at Centerra

24 hours daily
$0.30 per kWh
ENERTECH Multi Unit Dwelling
8 Level 2
J1772 (Level 2)

Lakeshore at Centerra

24 hours daily
$0.30 per kWh
ENERTECH Multi Unit Dwelling
8 Level 2
J1772 (Level 2)

Parcel Z06 Public Parking Lot

24 hours daily
$0.49/kWh Energy Fee
Blink Network
6 Level 2
J1772 (Level 2)

Eagle Ridge

24 hours daily
$1 activation fee; $0.25 per kWh
LOOP Other
6 Level 2
J1772 (Level 2)

Brandon CDJR

24 hours daily
EV Connect
6 Level 2
J1772 (Level 2)

LaQuinta Loveland - Enertech

24 hours daily
$0.30 per kWh
AUTEL Hotel
6 Level 2
J1772 (Level 2)

Rez School - Enertech

24 hours daily
$0.30 per kWh
AUTEL School
6 Level 2
J1772 (Level 2)

La Quinta Inn & Suites Loveland/Estes Park

24 hours daily
$0.30 per kWh
ENERTECH Hotel
6 Level 2
J1772 (Level 2)

Resurrection Church

24 hours daily
$0.30 per kWh
ENERTECH Place Of Worship
6 Level 2
J1772 (Level 2)

Resurrection Christian School

24 hours daily
$0.30 per kWh
ENERTECH School
6 Level 2
J1772 (Level 2)

City of Loveland - Service Center

For city vehicle use only
Non-Networked Muni Gov
4 Level 2
J1772 (Level 2)

Target T1178 (Loveland, CO)

24 hours daily
Electrify America
4 DC Fast
CCS/SAE Combo

4184 St Cloud Dr

24 hours daily
Blink Network
4 Level 2
J1772 (Level 2)

North Loveland Clinic

24 hours daily
Blink Network
4 Level 2
J1772 (Level 2)

Hertz Local Edition #654 - Tesla Destination

Tesla Destination
3 Level 2
Tesla

City of Loveland - Civic Center

24 hours daily
Non-Networked Muni Gov
2 Level 2
J1772 (Level 2)

City of Loveland - Public Library

24 hours daily
$0.20 per kWh
Non-Networked Library
2 Level 2
J1772 (Level 2)

What Is the EV Charging Outlook for Loveland?

Level 2 Focused Infrastructure

Loveland's charging network emphasizes Level 2 charging (89% of ports), ideal for overnight and workplace charging.

Diverse Network Coverage

With 10 different charging networks available, EV drivers in Loveland have excellent flexibility in choosing their preferred provider.

Where Else Can I Charge Near Loveland?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

🏨 Charge While You Stay — Hotels with EV Charging in Loveland

2 hotels with on-site EV charging · 12 Level 2 ports

LaQuinta Loveland - Enertech

Level 2

1450 Cascade Ave

🔌 6 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map

La Quinta Inn & Suites Loveland/Estes Park

Level 2

1450 Cascade Ave

🔌 6 ports · Public

Level 2: full charge (~200–300mi) in 8 hrs overnight

📍 View on Map
"We are putting in charging stations where people are, where people are running errands. They're going grocery shopping, they go to work. That's where we put our charging stations."

Badar Khan

CEO, EVgo

Source: Yahoo Finance (March 2025)