18 EV Charging Stations in Frisco, CO
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Frisco, Colorado has 18 publicly accessible EV charging stations with 55 charging ports. ChargePoint Network operates 77.8% of stations in the area, followed by Tesla at 11.1% — part of Colorado's 2,845 stations statewide.
44% of ports (24) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 56% (31) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.
For regional context, see how Colorado's EV infrastructure compares with Arizona.
18 EV charging stations in Frisco — 14 ChargePoint Network, 2 Tesla, 1 Electrify America , 24 public DC fast chargers. Last updated March 2026.
Infrastructure Grade
44% DC Fast
Based on DC Fast Charger ratio
24 of 55 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Frisco, CO?
Where Are the 18 Charging Stations in Frisco?
What Is the EV Charging Outlook for Frisco?
Strong Fast Charging Network
44% of charging ports in Frisco are DC fast chargers, providing good options for quick charging sessions.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Frisco with 78% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Frisco?
Denver, Colorado
Boulder, Colorado
Broomfield, Colorado
Westminster, Colorado
Breckenridge, Colorado
Littleton, Colorado
Golden, Colorado
Lakewood, Colorado
Aspen, Colorado
Louisville, Colorado
Data source: U.S. Department of Energy — Alternative Fuels Data Center
🏨 Charge While You Stay — Hotels with EV Charging in Frisco
1 hotel with on-site EV charging
AC Hotel - Tesla Supercharger
DC Fast1202 Summit Blvd
DC Fast: 80% charge in 30–45 min
📍 View on Map"Improving reliability, ease of use and addressing cost concerns are among a multitude of factors that must be prioritized to enhance the overall public EV charging experience."
Brent Gruber
Executive Director, EV Practice, J.D. Power
Source: J.D. Power 2025 Public Charging Study (August 2025)