1 EV Charging Stations in Tuolumne Meadows, CA

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

1 EV charging stations in Tuolumne Meadows — 1 RIVIAN_WAYPOINTS . Last updated May 9, 2026.

Where Are the 1 Charging Stations in Tuolumne Meadows?

Yosemite Curry Village

9010 Curry Village Drive
24 hours daily
RIVIAN_WAYPOINTS Public
J1772 (Level 2)
All 1 stations active as of 2026-05-09 See full California outage report →

Which EV Charging Networks Operate in Tuolumne Meadows, CA?

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 20 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 20.0

Data Status

Current

Last updated: May 9, 2026

Data sourced from U.S. DOE AFDC

As of May 2026, Tuolumne Meadows, California has 1 publicly accessible EV charging station with 20 charging ports. RIVIAN_WAYPOINTS operates 100% of stations in the area — part of California's 20,622 stations statewide.

All 20 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 23 stations in nearby Madera, approximately 96 miles away. See how CA compares with Oregon for broader regional context.

What Is the EV Charging Outlook for Tuolumne Meadows?

Level 2 Focused Infrastructure

Tuolumne Meadows's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

RIVIAN_WAYPOINTS Stronghold

RIVIAN_WAYPOINTS leads the market in Tuolumne Meadows with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Tuolumne Meadows average 20.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Tuolumne Meadows?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: May 9, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)