1 EV Charging Stations in Sierra Madre, CA
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Sierra Madre — 1 LOOP . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Sierra Madre?
Which EV Charging Networks Operate in Sierra Madre, CA?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Sierra Madre, California has 1 publicly accessible EV charging station with 2 charging ports. LOOP operates 100% of stations in the area — part of California's 20,622 stations statewide.
All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 2,004 stations in nearby Los Angeles, approximately 41 miles away. See how CA compares with Oregon for broader regional context.
What Is the EV Charging Outlook for Sierra Madre?
Level 2 Focused Infrastructure
Sierra Madre's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
LOOP Stronghold
LOOP leads the market in Sierra Madre with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Sierra Madre?
Los Angeles, California
Irvine, California
Santa Monica, California
Anaheim, California
Long Beach, California
Torrance, California
San Bernardino, California
Burbank, California
Fullerton, California
Riverside, California
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."