Verified · Jun 21, 2026

2 working DC fast chargers in Rio Vista

All verified working this week, with 3 Level 2 ports across Non-Networked, EV Connect.

Live reliability
2 working now none down

Stations · 2

98% working at California · verified Jun 7, 2026

Rio Sands Lodge

205 CA-12
Working
EV Connect DC Fast 3 ports CHAdeMO + J1772
90% working

Rio Vista City Hall

1 Main St
Working
Non-Networked Level 2 1 port J1772
98% working
Home charging in California costs 33.35¢/kWh — a full charge (60 kWh) costs about $20.01. Compare electricity prices →
All 2 stations active as of 2026-06-21 See full California outage report →

Which EV Charging Networks Operate in Rio Vista, CA?

Infrastructure Grade

25% DC Fast

Based on DC Fast Charger ratio

1 of 4 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 2.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Rio Vista, California has 2 publicly accessible EV charging stations with 4 charging ports. Non-Networked operates 50% of stations in the area, followed by EV Connect at 50% — part of California's 20,670 stations statewide.

25% of ports (1) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 75% (3) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 680 stations in nearby San Jose, approximately 93 miles away. See how CA compares with Oregon for broader regional context.

Where Else Can I Charge Near Rio Vista?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.