1 EV Charging Stations in Nuevo, CA
Locations, networks, and charger types — updated weekly from U.S. DOE data
1 EV charging stations in Nuevo — 1 AMPUP . Last updated May 9, 2026.
Where Are the 1 Charging Stations in Nuevo?
Which EV Charging Networks Operate in Nuevo, CA?
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 4 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: May 9, 2026
Data sourced from U.S. DOE AFDC
As of May 2026, Nuevo, California has 1 publicly accessible EV charging station with 4 charging ports. AMPUP operates 100% of stations in the area — part of California's 20,622 stations statewide.
All 4 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 792 stations in nearby Irvine, approximately 67 miles away. See how CA compares with Oregon for broader regional context.
What Is the EV Charging Outlook for Nuevo?
Level 2 Focused Infrastructure
Nuevo's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
AMPUP Stronghold
AMPUP leads the market in Nuevo with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Nuevo average 4.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Nuevo?
Irvine, California
Anaheim, California
San Bernardino, California
Fullerton, California
Riverside, California
Newport Beach, California
Costa Mesa, California
Orange, California
Santa Ana, California
Oceanside, California
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: May 9, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."