1 EV Charging Stations in Lukeville, AZ

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

As of March 2026, Lukeville, Arizona has 1 publicly accessible EV charging station with 2 charging ports. Non-Networked operates 100% of stations in the area — part of Arizona's 1,565 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 2 stations in nearby Ajo, approximately 57 miles away. See how AZ compares with California for broader regional context.

1 EV charging stations in Lukeville — 1 Non-Networked . Last updated March 2026.

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Lukeville, AZ?

All 1 stations active as of 2026-03-22 See full Arizona outage report →

Where Are the 1 Charging Stations in Lukeville?

Land Port of Entry - Lukeville

N Ajo Sonoita Hwy
Non-Networked Fed Gov
NEMA 14-50

What Is the EV Charging Outlook for Lukeville?

Level 2 Focused Infrastructure

Lukeville's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Lukeville with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Lukeville?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: March 22, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)