Verified · Jun 21, 2026

1 working DC fast charger in Nenana

All verified working this week, with 0 Level 2 ports across Tesla.

Live reliability
1 working now none down

Stations · 1

99% working at Alaska · verified Jun 7, 2026

Nenana - Tesla Supercharger

721 Main St
Working
Tesla DC Fast 8 ports CCS/SAE Combo + Tesla
98% working
Home charging in Alaska costs 27.17¢/kWh — a full charge (60 kWh) costs about $16.30. Compare electricity prices →
All 1 stations active as of 2026-06-21 See full Alaska outage report →

Which EV Charging Networks Operate in Nenana, AK?

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

8 of 8 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 8.0

Data Status

Current

Last updated: Jun 24, 2026

Data sourced from U.S. DOE AFDC

As of June 2026, Nenana, Alaska has 1 publicly accessible EV charging station with 8 charging ports. Tesla operates 100% of stations in the area — part of Alaska's 84 stations statewide.

100% of ports (8) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.

Drivers needing more charging options can find 2 stations in nearby Fairbanks, approximately 71 miles away.

What Is the EV Charging Outlook for Nenana?

High-Speed Charging Hub

Nenana has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

Tesla Stronghold

Tesla leads the market in Nenana with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Nenana average 8.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Nenana?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: June 21, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)

73% of EV chargers had at least one outage last month. Get the weekly outage report — free, every Tuesday.

Free. One email per week. Unsubscribe anytime.