2 EV Charging Stations in Springville, UT

Locations, networks, and charger types — updated weekly from U.S. DOE data

2
Charging Stations

As of March 2026, Springville, Utah has 2 publicly accessible EV charging stations with 10 charging ports. ChargePoint Network operates 50% of stations in the area, followed by Blink Network at 50% — part of Utah's 1,030 stations statewide.

All 10 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.

Drivers needing more charging options can find 202 stations in nearby Salt Lake City, approximately 69 miles away. See how UT compares with Colorado for broader regional context.

2 EV charging stations in Springville — 1 ChargePoint Network, 1 Blink Network . Last updated March 2026.

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 10 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 5.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Springville, UT?

All 2 stations active as of 2026-03-22 See full Utah outage report →

Where Are the 2 Charging Stations in Springville?

Lake Shore Industrial

2111 West Center Street
24 hours daily
J1772 (Level 2)

SCO SPRINGVILLEC1

762 W 400 S
24 hours daily
J1772 (Level 2)

What Is the EV Charging Outlook for Springville?

Level 2 Focused Infrastructure

Springville's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

High-Capacity Stations

Charging stations in Springville average 5.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Springville?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: March 22, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)