1 EV Charging Stations in Murdo, SD

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

As of March 2026, Murdo, South Dakota has 1 publicly accessible EV charging station with 4 charging ports. Tesla operates 100% of stations in the area — part of South Dakota's 121 stations statewide.

100% of ports (4) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.

Drivers needing more charging options can find 6 stations in nearby Pierre, approximately 63 miles away. See how SD compares with Minnesota for broader regional context.

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

4 of 4 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 4.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Murdo, SD?

Where Are the 1 Charging Stations in Murdo?

Range Country Lodging - Tesla Supercharger

24 hours daily. Please check Tesla's online station map to see if an adapter is required at this location.
Tesla
4 DC Fast
Tesla

What Is the EV Charging Outlook for Murdo?

High-Speed Charging Hub

Murdo has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

Tesla Stronghold

Tesla leads the market in Murdo with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Murdo average 4.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Murdo?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)