1 EV Charging Stations in Prairie City, OR

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

As of March 2026, Prairie City, Oregon has 1 publicly accessible EV charging station with 2 charging ports. Tesla Destination operates 100% of stations in the area — part of Oregon's 1,726 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.

Drivers needing more charging options can find 3 stations in nearby John Day, approximately 21 miles away. See how OR compares with California for broader regional context.

1 EV charging stations in Prairie City — 1 Tesla Destination . Last updated March 2026.

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Prairie City, OR?

All 1 stations active as of 2026-03-22 See full Oregon outage report →

Where Are the 1 Charging Stations in Prairie City?

Historic Hotel Prairie - Tesla Destination

112 Front St
J1772 (Level 2) Tesla

What Is the EV Charging Outlook for Prairie City?

Level 2 Focused Infrastructure

Prairie City's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

Tesla Destination Stronghold

Tesla Destination leads the market in Prairie City with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Prairie City?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: March 22, 2026

🏨 Charge While You Stay — Hotels with EV Charging in Prairie City

1 hotel with on-site EV charging · 1 Tesla Destination · 2 Level 2 ports

Historic Hotel Prairie

⚡ Tesla

112 Front St

🔌 2 ports · Public

Tesla Destination: full charge in 6–10 hrs overnight

📍 View on Map
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)