1 EV Charging Stations in Ione, OR
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Ione, Oregon has 1 publicly accessible EV charging station with 2 charging ports. ChargePoint Network operates 100% of stations in the area — part of Oregon's 1,726 stations statewide.
All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 22 stations in nearby Pasco, approximately 98 miles away. See how OR compares with California for broader regional context.
1 EV charging stations in Ione — 1 ChargePoint Network . Last updated March 2026.
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 2 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Ione, OR?
Where Are the 1 Charging Stations in Ione?
What Is the EV Charging Outlook for Ione?
Level 2 Focused Infrastructure
Ione's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
ChargePoint Network Stronghold
ChargePoint Network leads the market in Ione with 100% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Ione?
Pasco, Washington
Kennewick, Washington
Hermiston, Oregon
Pendleton, Oregon
Goldendale, Washington
Sunnyside, Washington
Boardman, Oregon
Heppner, Oregon
Condon, Oregon
Benton City, Washington
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: March 22, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."