2 EV Charging Stations in Fort Klamath, OR
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Fort Klamath, Oregon has 2 publicly accessible EV charging stations with 3 charging ports. Tesla Destination operates 50% of stations in the area, followed by ChargePoint Network at 50% — part of Oregon's 1,726 stations statewide.
All 3 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.
Drivers needing more charging options can find 31 stations in nearby Ashland, approximately 81 miles away. See how OR compares with California for broader regional context.
2 EV charging stations in Fort Klamath — 1 Tesla Destination, 1 ChargePoint Network . Last updated March 2026.
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 3 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Fort Klamath, OR?
Where Are the 2 Charging Stations in Fort Klamath?
What Is the EV Charging Outlook for Fort Klamath?
Level 2 Focused Infrastructure
Fort Klamath's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Where Else Can I Charge Near Fort Klamath?
Ashland, Oregon
Medford, Oregon
Klamath Falls, Oregon
Talent, Oregon
Crescent, Oregon
Central Point, Oregon
Crater Lake, Oregon
Chemult, Oregon
Chiloquin, Oregon
Idleyld Park, Oregon
Data source: U.S. Department of Energy — Alternative Fuels Data Center
🏨 Charge While You Stay — Hotels with EV Charging in Fort Klamath
1 hotel with on-site EV charging · 1 Tesla Destination · 1 Level 2 ports
Crater Lake Resort
⚡ Tesla50711 Highway 62
Tesla Destination: full charge in 6–10 hrs overnight
📍 View on Map"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."