2 EV Charging Stations in Woodward, OK

Locations, networks, and charger types — updated weekly from U.S. DOE data

2
Charging Stations

As of March 2026, Woodward, Oklahoma has 2 publicly accessible EV charging stations with 14 charging ports. FCN operates 100% of stations in the area — part of Oklahoma's 428 stations statewide.

86% of ports (12) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 14% (2) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our EV charging levels guide. View national charging statistics for broader context.

For regional context, see how Oklahoma's EV infrastructure compares with Texas.

2 EV charging stations in Woodward — 2 FCN , 12 public DC fast chargers. Last updated March 2026.

Infrastructure Grade

86% DC Fast

Based on DC Fast Charger ratio

12 of 14 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 2
Ports per Station 7.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Woodward, OK?

All 2 stations active as of 2026-03-22 See full Oklahoma outage report →

Where Are the 2 Charging Stations in Woodward?

Lot 9th & Texas

824 Texas Ave
24 hours daily
FCN
CHAdeMO (DC Fast) CCS/SAE Combo

Northwestern EC

2925 Williams Ave
24 hours daily
FCN
CHAdeMO (DC Fast) J1772 (Level 2) CCS/SAE Combo

What Is the EV Charging Outlook for Woodward?

High-Speed Charging Hub

Woodward has exceptional DC fast charging coverage with 86% of ports being high-speed chargers, well above the national average.

FCN Stronghold

FCN leads the market in Woodward with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Woodward average 7.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Woodward?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: March 22, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)