2 EV Charging Stations in Surf City, NC
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Surf City, North Carolina has 2 publicly accessible EV charging stations with 6 charging ports. ChargePoint Network operates 50% of stations in the area, followed by Non-Networked at 50% — part of North Carolina's 2,009 stations statewide.
All 6 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Available connector types include Tesla (NACS). Learn more in our ChargePoint network. View national charging statistics for broader context.
Drivers needing more charging options can find 34 stations in nearby Wilmington, approximately 37 miles away. See how NC compares with Georgia for broader regional context.
2 EV charging stations in Surf City — 1 ChargePoint Network, 1 Non-Networked . Last updated March 2026.
Infrastructure Grade
0% DC Fast
Based on DC Fast Charger ratio
0 of 6 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Surf City, NC?
Where Are the 2 Charging Stations in Surf City?
What Is the EV Charging Outlook for Surf City?
Level 2 Focused Infrastructure
Surf City's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.
Where Else Can I Charge Near Surf City?
Wilmington, North Carolina
New Bern, North Carolina
Jacksonville, North Carolina
Kinston, North Carolina
Beaufort, North Carolina
Southport, North Carolina
Morehead City, North Carolina
Clinton, North Carolina
Shallotte, North Carolina
Leland, North Carolina
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: March 22, 2026
🏨 Charge While You Stay — Hotels with EV Charging in Surf City
1 hotel with on-site EV charging · 4 Level 2 ports
Saltwater Suites
Level 2605 N Topsail Dr
Level 2: full charge (~200–300mi) in 8 hrs overnight
📍 View on Map"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."