1 EV Charging Stations in Caliente, NV

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

As of March 2026, Caliente, Nevada has 1 publicly accessible EV charging station with 2 charging ports. RIVIAN_WAYPOINTS operates 100% of stations in the area — part of Nevada's 677 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 4 stations in nearby Mesquite, approximately 95 miles away. See how NV compares with California for broader regional context.

1 EV charging stations in Caliente — 1 RIVIAN_WAYPOINTS . Last updated March 2026.

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Caliente, NV?

All 1 stations active as of 2026-03-22 See full Nevada outage report →

Where Are the 1 Charging Stations in Caliente?

Kershaw-Ryan State Park

300 Kershaw Canyon Road
24 hours daily
RIVIAN_WAYPOINTS Public
J1772 (Level 2)

What Is the EV Charging Outlook for Caliente?

Level 2 Focused Infrastructure

Caliente's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

RIVIAN_WAYPOINTS Stronghold

RIVIAN_WAYPOINTS leads the market in Caliente with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Caliente?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)