1 EV Charging Stations in Hatfield, MO

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

As of March 2026, Hatfield, Missouri has 1 publicly accessible EV charging station with 2 charging ports. RIVIAN_WAYPOINTS operates 100% of stations in the area — part of Missouri's 1,368 stations statewide.

All 2 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 15 stations in nearby Saint Joseph, approximately 98 miles away. See how MO compares with Illinois for broader regional context.

1 EV charging stations in Hatfield — 1 RIVIAN_WAYPOINTS . Last updated March 2026.

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 2 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 2.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Hatfield, MO?

All 1 stations active as of 2026-03-22 See full Missouri outage report →

Where Are the 1 Charging Stations in Hatfield?

Dunn Ranch Prairie

16970 W 150th St.
24 hours daily
RIVIAN_WAYPOINTS Public
J1772 (Level 2)

What Is the EV Charging Outlook for Hatfield?

Level 2 Focused Infrastructure

Hatfield's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

RIVIAN_WAYPOINTS Stronghold

RIVIAN_WAYPOINTS leads the market in Hatfield with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Hatfield?

Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.

Last synced: March 22, 2026

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)