3 EV Charging Stations in Batesville, MS

Locations, networks, and charger types — updated weekly from U.S. DOE data

3
Charging Stations

As of March 2026, Batesville, Mississippi has 3 publicly accessible EV charging stations with 7 charging ports. Non-Networked operates 66.7% of stations in the area, followed by RIVIAN_WAYPOINTS at 33.3% — part of Mississippi's 246 stations statewide.

All 7 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our EV connector types guide. View national charging statistics for broader context.

Drivers needing more charging options can find 77 stations in nearby Memphis, approximately 89 miles away. See how MS compares with Tennessee for broader regional context.

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 7 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 3
Ports per Station 2.3

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Batesville, MS?

Where Are the 3 Charging Stations in Batesville?

Home2 Suites by Hilton

24 hours daily; for guest use only
Free
Non-Networked Hotel
3 Level 2
J1772 (Level 2)

Fairfield Inn and Suites by Marriott Batesville

24 hours daily
RIVIAN_WAYPOINTS Public
2 Level 2
J1772 (Level 2)

Finch-Henry JCC

24 hours daily; Drivers must bring their own J1772 cordset for Level 1 charging
Non-Networked Fed Gov
2 Level 1
NEMA 14-50

What Is the EV Charging Outlook for Batesville?

Level 2 Focused Infrastructure

Batesville's charging network emphasizes Level 2 charging (71% of ports), ideal for overnight and workplace charging.

Non-Networked Stronghold

Non-Networked leads the market in Batesville with 67% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Batesville?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

🏨 Charge While You Stay — Hotels with EV Charging in Batesville

1 hotel with on-site EV charging · 3 Level 2 ports

Home2 Suites by Hilton

Level 2

443 Covenant Dr

🔌 3 ports · Public

Level 2: ~40–80mi range added per hour overnight

📍 View on Map
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)