3 EV Charging Stations in Minden, LA
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Minden, Louisiana has 3 publicly accessible EV charging stations with 9 charging ports. GRAVITI_ENERGY operates 66.7% of stations in the area, followed by Non-Networked at 33.3% — part of Louisiana's 329 stations statewide.
11% of ports (1) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 89% (8) are Level 2 chargers suited for longer stops. Available connector types include CCS, CHAdeMO. Learn more in our EV connector types guide. View national charging statistics for broader context.
Drivers needing more charging options can find 11 stations in nearby Shreveport, approximately 45 miles away. See how LA compares with Texas for broader regional context.
Infrastructure Grade
11% DC Fast
Based on DC Fast Charger ratio
1 of 9 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Minden, LA?
Where Are the 3 Charging Stations in Minden?
Exacta Inn Motel
Holiday Inn Express Minden
EVerCharge - Minden City Hall
What Is the EV Charging Outlook for Minden?
Level 2 Focused Infrastructure
Minden's charging network emphasizes Level 2 charging (89% of ports), ideal for overnight and workplace charging.
GRAVITI_ENERGY Stronghold
GRAVITI_ENERGY leads the market in Minden with 67% of stations, making their membership particularly valuable here.
Where Else Can I Charge Near Minden?
Shreveport, Louisiana
El Dorado, Arkansas
Ruston, Louisiana
Natchitoches, Louisiana
Bossier City, Louisiana
Hosston, Louisiana
Chatham, Louisiana
Magnolia, Arkansas
Haughton, Louisiana
Greenwood, Louisiana
Data source: U.S. Department of Energy — Alternative Fuels Data Center
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."