24 EV Charging Stations in Leawood, KS

Locations, networks, and charger types — updated weekly from U.S. DOE data

24
Charging Stations

As of March 2026, Leawood, Kansas has 24 publicly accessible EV charging stations with 44 charging ports. ChargePoint Network operates 100% of stations in the area — part of Kansas's 614 stations statewide.

All 44 ports are Level 2 chargers, which typically deliver a full charge in 4 to 8 hours — well suited for workplace, shopping, and overnight charging. Learn more in our ChargePoint network. View national charging statistics for broader context.

For regional context, see how Kansas's EV infrastructure compares with Colorado.

Infrastructure Grade

0% DC Fast

Based on DC Fast Charger ratio

0 of 44 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 24
Ports per Station 1.8

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Leawood, KS?

Where Are the 24 Charging Stations in Leawood?

EVERGY @LEAWD APT-078B

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

EVERGY @KC ORTHO -005B

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

EVERGY @MENORH MED164A

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

PARK PLACE VLGE SOUTH NALL #2

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

PARK PLACE VLGE 117TH GARAGE #1

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

EVERGY @LEAWD APT-078C

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

EVERGY @LEAWD APT-078A

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

EVERGY @KC ORTHO -005A

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

EVERGY @MENORH MED164C

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

EVERGY @MENORH MED164B

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

RESDNC GALLERIA STATION 1

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

RESDNC GALLERIA STATION 3

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

RESDNC GALLERIA STATION 4

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

RESDNC GALLERIA STATION 2

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

PARK PLACE VLGE SOUTH NALL #1

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

LEAWOOD VILLAGE LEAWOOD 6

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

LEAWOOD VILLAGE LEAWOOD 1

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

DEMDACO DEMDACO 1

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

DEMDACO DEMDACO 2

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

LEAWOOD VILLAGE LEAWOOD 4

24 hours daily
ChargePoint Network
2 Level 2
J1772 (Level 2)

What Is the EV Charging Outlook for Leawood?

Level 2 Focused Infrastructure

Leawood's charging network emphasizes Level 2 charging (100% of ports), ideal for overnight and workplace charging.

ChargePoint Network Stronghold

ChargePoint Network leads the market in Leawood with 100% of stations, making their membership particularly valuable here.

Where Else Can I Charge Near Leawood?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

"These results show we're moving in the right direction, but there's still work to do to ensure all EV drivers have access to reliable, welcoming public charging."

Joel Levin

Executive Director, Plug In America

Source: Plug In America (October 2025)