EV Charging Cost in Alabama: 17.15¢ per kWh

▼ 10% below US average
Residential electricity in Alabama costs 17.15¢/kWh (March 2026), the 21st most expensive of all 50 states and DC. A full 60 kWh EV charge costs about $10.29 — roughly 44% more than North Dakota, the cheapest state at 11.95¢/kWh.

Latest EIA data: March 2026 Published May 24, 2026 Source: U.S. Energy Information Administration

17.15¢
per kWh ▲ 6% MoM
$10.29
Full 60 kWh charge
4.9¢
Cost per mile
$1,092
Annual savings vs gas*

Alabama Electricity Price Trend (24 Months)

14¢ 16¢ 17¢ 18¢ 20¢ Apr '24Oct '24Apr '25Oct '25Mar '26 17.15¢
Alabama US average

Charging Cost by Battery Size in Alabama

Battery Example EV Est. range Full charge (0–100%)
40 kWh Nissan Leaf 140 mi $6.86
60 kWh Typical EV 210 mi $10.29
80 kWh Tesla Model 3 LR 280 mi $13.72
100 kWh Tesla Model S 350 mi $17.15

Estimated range and charge cost assume 3.5 mi/kWh efficiency at Alabama's 17.15¢/kWh residential rate. *Annual savings assumes 1,000 miles/month vs a 25 MPG gas car at $3.50/gallon.

Over the past year, electricity in Alabama has increased 3.56%, from 16.56¢ to 17.15¢ per kWh.

Compare Alabama to Neighboring States

More for Alabama EV Drivers

Frequently Asked Questions

How much does electricity cost in Alabama?

Residential electricity in Alabama costs 17.15¢/kWh as of March 2026, according to the U.S. Energy Information Administration. That is 10% below the US average of 19.16¢/kWh, ranking Alabama the 21st most expensive of all 50 states and DC.

How much does it cost to charge an EV in Alabama?

At 17.15¢/kWh, a full 0–100% charge costs about $6.86 for a 40 kWh battery, $10.29 for a typical 60 kWh EV, and $17.15 for a 100 kWh battery. That works out to roughly 4.9¢ per mile of driving.

Is it cheaper to drive an EV than a gas car in Alabama?

Yes. Driving 1,000 miles a month on electricity in Alabama costs about $588 a year, versus roughly $1,680 for a 25 MPG gas car at $3.50/gallon — an annual saving of about $1,092.

Electricity price from the U.S. Energy Information Administration (Form EIA-861), March 2026.