1 EV Charging Stations in Nenana, AK

Locations, networks, and charger types — updated weekly from U.S. DOE data

1
Charging Stations

As of March 2026, Nenana, Alaska has 1 publicly accessible EV charging station with 8 charging ports. Tesla operates 100% of stations in the area — part of Alaska's 86 stations statewide.

100% of ports (8) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include CCS, Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.

Drivers needing more charging options can find 2 stations in nearby Fairbanks, approximately 71 miles away.

1 EV charging stations in Nenana — 1 Tesla , 8 public DC fast chargers. Last updated March 2026.

Infrastructure Grade

100% DC Fast

Based on DC Fast Charger ratio

8 of 8 ports

How is this graded?

Based on DC Fast Charger ratio:

  • A: 40%+ DC Fast ports
  • B: 30–39%
  • C: 20–29%
  • D: 10–19%
  • F: Under 10%

Learn about charging levels

Density Metrics

Total Stations 1
Ports per Station 8.0

Data Status

Current

Last updated: Mar 25, 2026

Data sourced from U.S. DOE AFDC

Which EV Charging Networks Operate in Nenana, AK?

All 1 stations active as of 2026-03-08 See full Alaska outage report →

Where Are the 1 Charging Stations in Nenana?

Nenana - Tesla Supercharger

721 Main St
24 hours daily
Tesla Parking Lot
CCS/SAE Combo Tesla

What Is the EV Charging Outlook for Nenana?

High-Speed Charging Hub

Nenana has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.

Tesla Stronghold

Tesla leads the market in Nenana with 100% of stations, making their membership particularly valuable here.

High-Capacity Stations

Charging stations in Nenana average 8.0 ports each, reducing wait times and improving charging accessibility.

Where Else Can I Charge Near Nenana?

Data source: U.S. Department of Energy — Alternative Fuels Data Center

"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."

Loren McDonald

CEO & Chief Analyst, Paren

Source: Paren Q2 2025 Report (Q2 2025)