1 EV Charging Stations in Evergreen, AL
Locations, networks, and charger types — updated weekly from U.S. DOE data
As of March 2026, Evergreen, Alabama has 1 publicly accessible EV charging station with 12 charging ports. Tesla operates 100% of stations in the area — part of Alabama's 658 stations statewide.
100% of ports (12) are DC fast chargers capable of adding 100+ miles of range in under 30 minutes, while 0% (0) are Level 2 chargers suited for longer stops. Available connector types include Tesla (NACS). Learn more in our Tesla Supercharger network. View national charging statistics for broader context.
Drivers needing more charging options can find 12 stations in nearby Milton, approximately 85 miles away. See how AL compares with Florida for broader regional context.
1 EV charging stations in Evergreen — 1 Tesla , 12 public DC fast chargers. Last updated March 2026.
Infrastructure Grade
100% DC Fast
Based on DC Fast Charger ratio
12 of 12 ports
How is this graded?
Based on DC Fast Charger ratio:
- A: 40%+ DC Fast ports
- B: 30–39%
- C: 20–29%
- D: 10–19%
- F: Under 10%
Density Metrics
Data Status
Current
Last updated: Mar 25, 2026
Data sourced from U.S. DOE AFDC
Which EV Charging Networks Operate in Evergreen, AL?
Where Are the 1 Charging Stations in Evergreen?
Piggly Wiggly - Tesla Supercharger
90 Liberty Hill PlaceWhat Is the EV Charging Outlook for Evergreen?
High-Speed Charging Hub
Evergreen has exceptional DC fast charging coverage with 100% of ports being high-speed chargers, well above the national average.
Tesla Stronghold
Tesla leads the market in Evergreen with 100% of stations, making their membership particularly valuable here.
High-Capacity Stations
Charging stations in Evergreen average 12.0 ports each, reducing wait times and improving charging accessibility.
Where Else Can I Charge Near Evergreen?
Data sourced from the US DOE Alternative Fuels Station Locator (AFDC), maintained by NREL.
Last synced: March 22, 2026
"2025 is going to be a record year for deployment of DC fast charging ports — and 2024 was already the highest year on record. Charging 2.0 players are deploying new — and larger — stations at a breakneck pace."